Call
02 4404 0504 — seven days a week, 6:00am to 7:00pm.
If you get voicemail we are on a measure. Leave your suburb and what the room is, and you will get a call back the same day.
What to tell us
- Your suburb — Bankstown, Punchbowl, Greenacre, Revesby, Padstow, Yagoona, Condell Park or anywhere across Canterbury-Bankstown.
- What the room is — main bathroom, ensuite, powder room, laundry, or a combination.
- Roughly how big. "About 2 metres by 2.2" is enough to place it in a band.
- Roughly when the house was built. This is the asbestos question, and it changes the sequence rather than just the total.
- House or unit. If it is a unit, tell us whether you have spoken to strata.
- Is the toilet separate? If so, combining the two rooms is probably the conversation worth having.
- Photos. A picture of the existing room is worth several paragraphs.
Why we insist on measuring
Phone estimates for bathrooms are close to worthless. The two things that move the price most — what is behind the tiles and whether the waste can stay put — cannot be seen down a phone line.
Anyone giving you a firm number without visiting is either guessing or planning to vary it later. The measure takes about half an hour and costs nothing.
What happens next
- A measure, at a time that suits — including evenings and weekends.
- Where the age warrants it, a hazardous materials survey before the price is finalised.
- A written, itemised quote naming the fittings, the tile allowance and the inclusions.
- If you proceed, a program in working days with the waterproofing cure time in it.
Where we work
Bankstown, Punchbowl, Greenacre, Revesby and Padstow, plus Yagoona, Condell Park, Chester Hill, Bass Hill and Georges Hall.
We are a service-area business — we come to you, and there is no showroom to visit.
From first call to hand-back
- Measure — half an hour at your place, no cost, evenings and weekends included.
- Survey where the age warrants it, before the price is finalised rather than after.
- Written quote — fittings named, tile allowance stated, variation method set out.
- Build — 15 to 20 working days, with the waterproofing cure time shown.